Solid Waste Management |
| |
|
MUNICIPAL SOLID WASTE MANAGEMENT SYSTEM IN CIDCO
AREA OF NAVI MUMBAI
|
|
CIDCO has implemented Municipal Solid Waste (Management & Handling) Rules -2000 for the area under jurisdiction of CIDCO i.e. New Panvel, Kalamboli, Kamothe, Kharghar, Dronagiri, etc.
Solid Waste Management System is broadly divided in two parts -
A. Collection & Transportation of Municipal Solid Waste (MSW)
B. Processing & disposal of MSW
A. COLLECTION & TRANSPORATATION OF MSW
The present solid waste generation is to the tune of 65 MT/day.
The method of collection & transportation of MSW followed is as under -
1) Daily collection of MSW on house -to-house basis.
2) Daily collection of MSW from community bins.
3) Transportation of MSW in closed body vehicle up to processing & disposal site.
4) Conducting public awareness programs for segregation and storage of MSW in two categories as Dry (Non-Bio degradable) & Wet (Bio degradable) waste.
5) Collection & Transportation of debris.
6) Collection & disposal of green waste lying on roads.
7) Removal and hygienically disposal/burial of animal carcasses.
8) Cleanliness of roads & collection of street sweepings.
9) Machineries Deployed for collection and transportation are -
i. Refused Compactors- 6 nos.
ii. Auto Rickshaws with tipping arrangement-3 nos.
iii. Skip loaders-1 no.
iv. Skip Bins-6 nos.
v. Grab & Crane- 1 no.
vi. Community Bins-86 nos.
vii. Hand cart with Bin-100 nos.
viii. Litter Bins-at appropriate locations.
CIDCO awarded the work of Collection & Transportation of MSW to M/s.Antony Waste Handling Cell (P) Ltd. and the system is in operation.
For any information/redressal regarding collection & Transportation of MSW office of Public Health Department of CIDCO may be contacted.
Chief Health Officer, CIDCO – 022 67918163
New Panvel - 022 27452590
B. MSW PROCESSING & DISPOSAL FACILITY
CIDCO has developed its own MSW processing & disposal facility at Village Chal near Taloja MIDC. Receiving and treatment of waste is started from 23rd November 2007. Compost production will be started soon after maturation period of 45 days will be over.
The Plot area is approximately 14 Ha. The site is selected as per the guidelines of regulatory authority and authorization from Pollution Control Board is obtained.
The waste received at the facility shall be processed & disposed off scientifically. The site is designed for 15.5 years period considering 65MT of MSW per day with progressive increase annually. The total storage capacity of landfill is about 3,65,000 MT.
Methodology of Waste Processing
Waste received shall be taken to processing area where the recyclables and bulky material shall be separated manually and stored in recyclable bins. The waste shall be processed by Aerobic composting technology using windrow method. Microbial Culture shall be used to increase the rate of stabilization. The stabilized waste shall be further processed and refined to form compost. The rejects of the process shall be taken to landfill for final disposal.
Methodology of Disposal in Landfill
Rejects of waste processing shall be transported & deposited in the land fill. The waste is compacted and covered with inert materials daily as per the placement plan. Leachate collected in the sump well shall be pumped to leachate holding pond.
During the entire operation of facility, Environment Monitoring shall be done as per MPCB guidelines.
The work of development & operation of facility is awarded to M/s.Bharuch Enviro Infrastructure (P) Ltd. Major civil works of development have completed. The erection of composting machinery is in progress. The facility will be brought under operation shortly.
For any information regarding MSW Processing & Disposal facility the office of Executive Engineer (ENV-I), CIDCO may be contacted.
Executive Engineer (ENV-I) - 022 67121012./9820113601
|
|