Sub: Procedure to release water connection at various CIDCO’s Node in Navi Mumbai.

Consumers intending to get water connection from CIDCO have to follow following procedures -


1. Engage Licensed Plumber for carrying out the plumbing work of the premises.

2. Make application in the prescribed format with the signature of owner and Licensed Plumbers on the application form.

3. Following documents are to be submitted along with application.

a) Occupancy Certificate issue by Town Planning / Building Permission Department or Possession Receipt in case of individual flat.

b) Commencement Certificate.

c) Copy of approved plan with Cross-Section showing underground and overhead tank and distribution pipeline network.

d) Location plan signed by owner and Licensed Plumber.

e) Certificate of completion of plumbing by Licensed Plumber.

f) Statement of showing total built-up-area, No. of Flat, No. of Shops, Capacity of underground & Overhead Water Tank.

g) No Objection Certificate issued by Estate Department.

h) Services Charges Clearance Certificate issued by Estate Department

i) Drainage connection issued by receptive Nodal Executive Engineer.

j) Undertaking on stamp paper of Rs.100/- regular payment of water charges as per water tariff at prevailing rates time-to-time.

k) Agreement to be executed between consumer and CIDCO on stamp paper of Rs.100/- .

l) Copy of lease agreement for plot .

m) Copy of resolution/Power of Attorney in case of person representing an Orgnisation/ a person other than owner signing the agreement.

n) In case of multi-storied building (above G+4) following documents are necessary.
    1) NOC from Fire Officer
    2) Approval of Plumbing Design.

o) Submit the application to Assistant Engineer in respective Node/Area.

p) After verification of documents and site visit the proposal is to be forwarded to the respective Asstt. Executive Engineer.

q) After inspection the Asstt. Executive Engineer recommends the proposal to concerned Executive Engineer

r) After getting approval from Executive Engineer necessary deposit and connection charges will have to be paid in Accounts Department.

s) After Confirmation of receipt of necessary payment Agreement in the prescribed format is to be executed.

t) After execution of agreement concerned Asstt. Engineer ensures the works or fixing of water meter and other assembling and allows connection through the CIDCO plumber.

Application for Domestic/Commercial/Construction/institution Water Supply Connection

From:  ________________________
________________________
________________________
Date :  ________________________

To
Executive Engineer (ENV-I)
CIDCO Ltd.
4th floor, Raigad Bhavan,
CBD Belapur, Navi Mumbai.

Sub: Grant of Permanent/Temporary Water Supply Connection.

Dear Sir,
I, the undersigned Shri ______________________________ residing at House/Plot/Shop No. _____________ Sector _______ at ________________, Navi Mumbai hereby request you to grant me a ___________ mm diameter permanent/temporary water connection for Domestic/Commercial/Institutional purpose at the earliest. I hereby declare that

a) I know and abide by the rules of water supply I will also abide by the changes those I will take place in it from time to time.

b) I am ready to pay the water charges at the prevailing rates.

c) I am fully aware that I will get water supply at the fixed time with available pressure and I will not complain about the pressure and quantity of the water received.

d) I will carry out the connection work through Shri M/s _________________________________________the Licensed Plumber. The work of connection on the line and the fixing of water meter will be carried out under the supervision of the departmental person through the Licensed Plumber.

e) The water meter will be fixed in the secured chamber near tapping point and in the premises of my House/Plot so as to enable the meter reading to inspect the water meter and to carry out other necessary work conveniently, as and when required.

f) I will carry out the connection work only after getting permission from the concern authority to dig the road. As also we will construct permanent gutter to drain out the rain water, etc.

g) I will bring the water meter of the appropriate size with the stand by water meter having the test report from the laboratory of MCGB/MIDC/MWSSB/TMC or any other laboratory authorized by CIDCO.

h) I will sign an agreement in duplicate in the prescribed proforma on the stamp paper of Rs. 100/-. The charges for stamp paper will be borne by me.

i) I will pay the security deposit for this water connection as per CIDCO rules.

I hereby further declare that I will be responsible to keep the water meter in good working condition. In case of damage to water meter, I will replace the same with new at my own cost, under intimation to your office. I will not complain in case of disconnection of water supply to my premises due to non-replacement of damaged water meter or non-payment of the water charges bill in the prescribed time. I also undertake to pay the connection charges.

I am the legal/authorized/owner/tenant of the said house/plot for which water connection is requested.

The documents listed in the enclosed statement are submitted herewith for approval please.

Thanking you,

        Yours faithfully,
( ____________________ )


Signature of Licensed Plumber
Name ________________________
License No. ____________________
Address _______________________
______________________________